HiTech logooffice (678) 697-6752
fax (855) HITECH1

  A HiTech Home Check, Inc.

2. Standards of Practice

2.5 Cooling

I. The inspector shall inspect:

     A.   the central cooling equipment using normal operating controls.

II. The inspector is not required to:

  1. determine the uniformity, temperature, flow, balance, distribution, size, capacity, BTU, or supply adequacy of the cooling system.
  2. inspect window units, through-wall units, or electronic air filters.
  3. operate equipment or systems if the exterior temperature is below 60° Fahrenheit, or when other circumstances are not conducive to safe operation, or may damage the equipment.
  4. inspect or determine thermostat calibration, cooling anticipation, or automatic setbacks or clocks.
  5. examine electrical current, coolant fluids or gases, or coolant leakage.

2.6 Plumbing